Installation / Initial Set-Up

13

There are a number of important steps required to set up your generator for initial use. These
steps are:

Steps for Installation / Initial Set-Up

1. Unpacking & delivery inspection.

2. Planning the power load to stay within the generator’s rated

capacity.

3. Getting gas hook-ups installed if natural gas or LP gas will be used as

a fuel source.

4. Setting up generator for the type of power generation you need:

a. portable power source, or

b. connected to a building as a back-up power source.

5. Selecting a site for using the generator.

6. Grounding.

7. Battery installation (electric start models only).


Each of these steps is discussed in detail below:

1. Unpacking & Delivery Inspection

You should inspect the generator immediately after you receive delivery.

See the “Machine Component Identification” section of this manual for a
diagram of the generator and its components.

• If you have missing components, contact Product Support at 1-800-270-0810.

• If you have damaged components, contact the freight company that delivered the unit and file a

claim.


2. Planning the Power Load

Plan your power load so that you do not exceed the generator’s rated capacity.

See the “Power Load Planning & Management” section of this manual to review how to plan and
manage power loads for the generator.