4-2 c200hx/hg/he and cqm1h-series plcs, C200hx/hg/he and cqm1h-series plcs – Omron CQM1H-CLK21 User Manual

Page 293

Advertising
background image

270

Message Delay Times

Section 8-4

8-4-2

C200HX/HG/HE and CQM1H-series PLCs

SEND(90)

The following diagram indicates the data flow which will yield the maximum
delay time from the time SEND(90) is executed by the user program to the
time the Controller Link Unit stores the data in the destination Unit’s memory.

Max. transmission delay = Link Unit servicing interval (source node) + Trans-
mission processing + Communications cycle time + Transmission delay +
Reception processing + Link Unit servicing interval (destination node).

Link Servicing Interval (Source and Destination Nodes)

Link service processing is the same as the PLC’s peripheral servicing and is
approximately 1 ms for Controller Link Units.

Transmission Processing

Responses:

Number of words transferred

×

0.00125 ms + 3 ms

Communications Cycle Time (with Data Links Inactive)

See 8-2 Communications Cycle Time (on page 251).

Transmission Delay Time

Transmission delay time varies with the baud rate.

Reception Processing

Responses:

Number of words transferred

×

0.00125 ms + 2.3 ms

Note The I/O response time can increase due to noise or restrictions on the number

of frames that can be transmitted while the data link is operating.

SEND(90)
executed

Link Unit servicing
(source node)

Transmission processing

Communications cycle

Data stored

Link Unit servicing (destination
node)

Transmission delay

Max. transmission delay

Reception processing

Baud rate

Transmission delay time

2 Mbps

Number of words transferred

×

0.08 + 0.112 ms

1 Mbps

Number of words transferred

×

0.016 + 0.224 ms

500 Kbps

Number of words transferred

×

0.032 + 0.448 ms

Advertising
This manual is related to the following products: