2 message service procedure, Message service procedure – Omron CQM1H-CLK21 User Manual

Page 63

Advertising
background image

40

Message Service Procedure

Section 2-2

C200HX/HG/HE:

AR 0700 (operating level #0),
AR 0704 (operating level #1)

CVM1/CV Series: Word 0 of DM 2000 + 100

×

N

CQM1H Series:

AR 0700

Note The data links will not start if there is an error in the data link tables

in the startup node. Data links can be started and stopped using the
Controller Link Support Software.

2-2

Message Service Procedure

The following steps outline the basic procedure for using the message ser-
vice.

1,2,3...

1.

Install and wire the Units.

2.

Prepare for communications.

3.

Turn ON the power to the PLC.

4.

Create the I/O tables.

5.

Register routing tables if using inter-network connections.

Contents

Remarks

Page

a. Mount the Units to the PLCs.

---

59

b. Wire the Network.

---

66

Contents

Remarks

Page

a. Set the unit number.

CS/CJ-series, CVM1, and CV-
series PLCs only

98

b. Set the node address.

---

94, 98

c. Set the baud rate.

---

95, 99

d. Set the operating level.

C200HX/HG/HE PLCs only

95

e. Set the terminal resistance.

---

96, 99

Contents

Remarks

Page

Turn ON the power to the PLC.

---

---

Contents

Remarks

Page

Create the I/O tables.

CS/CJ-series, CVM1, and CV-
series PLCs only

---

Contents

Remarks

Page

a. Set the local network table

---

237

b. Set the relay network table

---

Lot No.:

@

@

4 6 . . . . . Manufactured in April 1996

Indicates the last digit of the manufacturing
year. In this example, the year is 1996.

Indicates the month of manufacture. October,
November, and December are indicated by x, y,
and z respectively. In this example, the month is
April.

Note

Routing tables are required if any of the CVM1 and CV-series CPU Units

in the Network has been manufactured on or before April 1996.

Advertising
This manual is related to the following products: