I. Brick

Installation

The pilot shield has to be removed to install or remove the
brick refractory. Removal of the bracket requires remov-
ing two screws.

Figure 12.11

Figure 12.12

Figure 12.13

Figure 12.14

Figure 12.15

Figure 12.10

PILOT

BRACKET

PILOT

SHIELD

To install the baffl e, slide it in at an angle and rotate
upward, parallel with the fi rebox. Place baffl e up against
the heat exchangers in top of the fi rebox. Holding the baffl e
against the heat exchangers, slide the baffl e towards the
front of the appliance.

Note: To aid in brick installation, the burner may be removed.

Keeping the baffl e elevated with your free hand, put the
right side brick into position. Rest the baffl e on the right
side brick.

Still holding the baffl e in place, install the left brick into
position.

Install the rear brick. Slide it in at an angle and place it over
the rear brick retainer. Hand bend retaining tabs up to hold
brick in place. Slide baffl e back until touching rear brick.

Bend retaining tabs on the left and right sides inward to
hold brick in place.

RETAINING TABS

RETAINING TABS