Cardio port, Battery – Vision Fitness S70 User Manual

Page 16

Advertising
background image

12

CO

N

SO

LE

CARDIO PORT

CARDIO PORT

A Cardio Port is located on the back of the console that is compatible

to entertainment protocol, such as Cardio Theatre. The bottom port is the

active port to use for this function

These ports are located on the backside of the console and are enclosed

by removable covers.

BATTERY

: The S70 is equipped with a Sealed Lead Acid battery inside the

frame to power the incline and console. It is suggested to plug the S70

in for 6 – 12 hours after initial install to fully charge the battery. Be sure

the power switch is turned to the “On” position to ensure the battery will

charge. After that time, the unit will function properly when self-powered.

When stored, the battery should be kept in a cool, dry area.

S70_101215.indd 12

12/15/10 1:04 PM

Advertising