WhisperKool SS7000 User Manual

Page 16

Advertising
background image

-16-

8. Attaching refrigeration lines.
Line up the piping connections. Energize the liquid line solenoid valve, connect Dry Nitrogen, and

adjust to a slight flow through the tubing, being sure no pressure develops in the piping. Connect

flare fittings if a flare fitting model, tighten securely, braze other fittings, leak check, evacuate to

200 microns, charge with R-134 refrigerant, start and check out. Using wire ties, secure tubing as

low as possible in the evaporator so tubing is not visible through air inlet grille.

Note: Be sure the tubes do not stick

out beyond the evaporator opening

for the front panel.

Advertising
This manual is related to the following products: