Cable assembly – Weider WESY96310 User Manual

Page 11

Advertising
background image

11

15. See the inset drawing. Attach the Military Press

Arm (84) to the Pivot Arm (101) with two 5/16” x
2 1/4” Bolts (33) and two 5/16” Nylon Locknuts
(3).

Press two 1 1/2” Square Inner Caps (32) into the
indicated end of the Military Press Arm (84).
Press two 1” Round Inner Caps (49) into the
Military Press Arm. Slide two 5” Plastic Grips (83)
onto the Military Press Arm.

Attach the Military Press Arm (84) to the VKR
Upright (74) with a 3/8” x 3 1/4” Bolt (67) and a
3/8” Nylon Locknut (21).

16.

Locate and open the parts bags labeled
“CABLE ASSEMBLY” and “PULLEYS.”

During steps 16 through 36, refer to the CABLE
DIAGRAMS on pages 25 and 26 of this manual
to verify proper cable routing. Before beginning
this section, fully unwind the four Cables. Identify
the four Cables by comparing the lengths and
ends of the Cables. The approximate length of
each Cable is listed (in inches) after the key num-
ber in the drawing.

IMPORTANT: While assembling the cables, do
not overtighten the bolts and nuts attaching
the pulleys; the pulleys must be able to turn
freely.

17.

Locate the High Cable (58). Wrap the High
Cable around a 3 1/2” Pulley (15). Attach the
Pulley to the Top Frame (55) with a 3/8” x 3 3/4”
Bolt (88) and a 3/8” Nylon Locknut (21).

Be sure

that the ball on the Cable is on the indicated
side of the Pulley, and that the Cable is
between the Pulley and the hook.

17

55

21

58

Ball

Hook

15

49

32

83

84

84

101

101

21

67

56

74

33

3

16

23—79”

58—147”

72—194”

99—63”

CABLE ASSEMBLY

32

15

88

Advertising