Cable assembly – Weider WESY29521 User Manual

Page 11

Advertising
background image

11

20.

Note: The following drawings are shown from
the left side of the weight system, with the
Left Top Frame (3) removed for clarity.

Wrap the High Cable (45) around a 90mm Pulley
(38). Attach the Pulley at the rear hole, inside of
the bracket on the Center Top Frame (14) with an
M10 x 45mm Bolt (66) and an M10 Nylon Locknut
(70).

17.

Locate the High Cable (45). Route the Cable up
through the Left Top Frame (3) and around a
90mm Pulley (38). Attach the Pulley inside the
Top Frame with an M10 x 70mm Bolt (81), two
M10 Washers (75), two 13mm Spacers (34), and
an M10 Nylon Locknut (70).

18. Route the High Cable (45) around a 90mm Pulley

(38) and down through the Left Top Frame (3).
Attach the Pulley and a Cable Trap (91) inside
the Top Frame with an M10 x 70mm Bolt (81),
two M10 Washers (75), two 13mm Spacers (34),
and an M10 Nylon Locknut (70).

Be sure the

Cable Trap is turned to hold the Cable in the
groove of the Pulley.

Note: To complete this step, it may be neces-
sary to loosen the indicated M10 Nylon
Locknuts (70). Retighten the Locknuts when
this step is completed.

19. Wrap the High Cable (45) around a 90mm Pulley

(38). Attach the Pulley to the single hole side of
the Adjustable Double “U”-Bracket (56) with an
M10 x 45mm Bolt (66) and an M10 Nylon Locknut
(70).

38

45

75

70

81 75

34

3

34

17

3

34

75

34

75

81

38

70

70

91

45

18

70

56

38

66

45

19

38

66

70

45

14

20

CABLE ASSEMBLY

IMPORTANT: While assembling the cables,
do not overtighten the locknuts attaching
the pulleys; the pulleys must be able to turn
freely. Refer to the CABLE DIAGRAMS and
the CABLE ID CHART on pages 24 and 25
for help identifying the cables and for prop-
er cable routing.

Advertising