Master/slave operation states, Master unit, Slave unit – Xantrex Technology GT100E User Manual

Page 15

Advertising
background image

Master/Slave Operation States

152602

1–3

If daily role reversal is on, then the configured slave is operational slave
on odd days (January 1,3,5,...) and operational master on even days
(January 2,4,6,...).

Master Unit

The

GT100E

Master inverter will control the

GT100E MS

Combiner Box

via a control cable. The Master inverter will enable and disable the Slave
inverter, and monitor the status of the Slave inverter through an
interconnect cable. If the interconnect cable is disconnected, the master
will open the combiner box and go online.

Slave Unit

The

GT100E

Slave inverter will monitor the status of the Master inverter

through the interconnect cable. The inverter will be enabled from the
Master inverter. If the interconnect cable is disconnected then the slave
will go online.

Master/Slave Operation States

The Master/Slave operation states will follow the standard states specified
by the

GT100E Grid Tie Inverter Operation, Maintenance and

Troubleshooting Manual (P/N 152365)

with the following Master/Salve

configuration state.

1. At Power up, the Master inverter will disable the Slave inverter, and

close the contactor in the

GT100E MS

Combiner Box.

2. The Master inverter will go online through the normal operating

States. The Slave inverter will remain disabled.

3. When the Master inverter's power level increases, and reaches the

High Power Threshold (configurable parameter). The Master inverter
will shutdown, open the contactor in the

GT100E MS

Combiner Box,

and the Master will also enable the Slave inverter.

4. Both the Master and Slave Inverters will go to an online state.

5. End of the Day or Cloud Interaction - When the Master inverter's

power level decreases, and reaches the Low Power Threshold and has
maintained the power level for the Minimum Transition Seconds
(configurable parameter). The Master and the Slave inverters will

Advertising