Caution – Xantrex Technology GT100E User Manual

Page 34

Advertising
background image

Configuration

3–4

152602

3. Click Send Configuration

4. Verify that the Present Inverter Data has the unit set as the Configured

Slave unit.

Refer to the GUI Help menu for complete configuration instructions.

Important:

If the inverter's date (not the workstation's!) is odd then the

Inverter is OPERATIONAL SLAVE until midnight; if the date is even, the
Inverter is OPERATIONAL MASTER until midnight.

CAUTION

The Master/Slave configuration will only be activated after power is cycled on
the unit.

Important:

Verify that the date is the same on both the GT100E #1 and

GT100E #2. This will allow the daily role reversal option to function correctly.

Advertising