Xantrex Technology GT100E User Manual

Page 25

Advertising
background image

Cable Installation

152602

2–9

To make PV Array #2 and GT100E #2 connections:

1. Route the GT100E #2 cables through the access panel and connect the

cables to GT100E UNIT #2 PV(+) and PV(-) terminals, see Figure 2-
6.

2. Route the PV Array #2 cables through the access panel and connect

the cables to PV ARRAY #2 PV(+) and PV(-) terminals, see Figure 2-
6.

3. Route the PV Array #2 ground cable through the access panel and

connect the cable to PV ARRAY #2 GND terminal see Figure 2-6.

Figure 2-6 PV Array #2 and GT100E #2 Connections

Combiner Box
PV ARRAY #2
PV (+) Terminal

Combiner Box
PV ARRAY #2
PV (-) Terminal

Combiner Box
GT100E #2
PV (+) Terminal

Combiner Box
GT100E #2
PV (-) Terminal

Combiner Box
PV ARRAY #2
GND Terminal

Advertising