York DM150 User Manual

Page 10

Advertising
background image

127408-YIM-B-0606

10

Unitary Products Group

LOCATION

Use the following guidelines to select a suitable location for
these units:

1.

Unit is designed for outdoor installation only.

2.

Condenser coils must have an unlimited supply of air.
Where a choice of location is possible, position the unit
on either north or east side of building.

3.

Suitable for mounting on roof curb.

4.

For ground level installation, use a level concrete slab
with a minimum thickness of 4 inches (102 mm). The
length and width should be at least 6 inches (152 mm)
greater than the unit base rails. Do not tie slab to the
building foundation.

5.

Roof structures must be able to support the weight of the
unit and its options/accessories. Unit must be installed on
a solid, level roof curb or appropriate angle iron frame.

6.

Maintain level tolerance to 1/2” (13 mm) across the entire
width and length of unit.

RIGGING AND HANDLING

Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. Rig
the unit by attaching chain or cable slings to the lifting holes
provided in the base rails. Spreader bars, whose length
exceeds the largest dimension across the unit, MUST be
used across the top of the unit.

Units may be moved or lifted with a forklift. Slotted openings
in the base rails are provided for this purpose.

LENGTH OF FORKS MUST BE A MINIMUM OF 60 INCHES
(1524 mm.).

TABLE 1: UNIT VOLTAGE LIMITATIONS

Power Rating

*

*.

Utilization range “A” in accordance with ARI Standard
110.

Minimum

Maximum

380/415-3-50

342

456

TABLE 2: UNIT TEMPERATURE LIMITATIONS

Temperature

Min.

Max.

Wet Bulb Temperature

°F(°C) of Air

on Evaporator Coil

57(14)

72(22)

Dry Bulb Temperature

°F(°C) of Air

on Condenser Coil

0(-18)

125(52)

Excessive exposure of this furnace to contaminated
combustion air may result in equipment damage or
personal injury. Typical contaminates include: per-
manent wave solution, chlorinated waxes and clean-
ers, chlorine based swimming pool chemicals, water
softening chemicals, carbon tetrachloride, Halogen
type refrigerants, cleaning solvents (e.g. perchloro-
ethylene), printing inks, paint removers, varnishes,
hydrochloric acid, cements and glues, antistatic fab-
ric softeners for clothes dryers, masonry acid wash-
ing materials.

If a unit is to be installed on a roof curb other than a
YORK roof curb, gasketing must be applied to all sur-
faces that come in contact with the unit underside.

Before lifting, make sure the unit weight is distrib-
uted equally on the rigging cables so it will lift evenly.

All panels must be secured in place when the unit is
lifted.

The condenser coils should be protected from rig-
ging cable damage with plywood or other suitable
material.

FIGURE 5 -

UNIT 4 POINT LOAD

D

A

C

B

L E F T

F R O N T

Advertising
This manual is related to the following products: