NOTE:

To find the Btu input, multiply the number of cubic
feet of gas consumed per hour by the Btu content of
the gas in your particular locality (contact your gas
company for this information as it varies widely from
area to area).

EXAMPLE:

By actual measurement, it takes 19 seconds for the hand on
a 1 cubic foot dial to make a revolution with a 192,000 Btuh
furnace running. To determine rotations per minute, divide 60
by 19 = 3.16. To calculate rotations per hour, multiply 3.16

60 = 189.6. Multiply 189.6

• 1 (0.5 if using a 1/2 cubic foot

dial) = 189.6. Multiply 189.6

• (the Btu rating of the gas). For

this example, assume the gas has a Btu rating of 1050
Btu/ft.

3

. The result of 199,000 Btuh is within 5% of the

192,000 Btuh rating of the furnace.

ADJUSTMENT OF TEMPERATURE RISE

The temperature rise (the difference of temperature between
the return air and the heated air from the furnace) must lie
within the range shown on the CSA rating plate and the data
in Table 47.

After the temperature rise has been determined, the CFM can
be calculated as follows:

After about 20 minutes of operation, determine the furnace
temperature rise. Take readings of both the return air and the
heated air in the ducts (about 6 feet from the furnace) where
they will not be affected by radiant heat. Increase the blower
CFM to decrease the temperature rise; decrease the blower
CFM to increase the rise (See ’SUPPLY AIR DRIVE
ADJUSTMENT’).

NOTE:

Each gas heat exchanger size has a minimum
allowable CFM. Below this CFM, the limit will open.

BURNERS/ORIFICES INSPECTION/SERVICING

Before checking or changing burners, pilot or orifices,
CLOSE MAIN MANUAL SHUT-OFF VALVE AND SHUT OFF
ALL POWER TO THE UNIT.

1.

Open the union fitting just upstream of the unit gas valve
and downstream from the main manual shut-off valve in
the gas supply line.

2.

Remove the screws holding each end of the manifold to
the manifold supports.

3.

Disconnect wiring to the gas valves and spark igniter(s).
Remove the manifold & gas valve assembly. Orifices can
now be inspected and/or replaced.

To service burners, complete step 4.

4.

Remove the heat shield on top of the manifold supports.
Burners are now accessible for inspection and/or
replacement.

NOTE:

Reverse the above procedure to replace the assem-
blies.

Make sure that burners are level and seat at the rear of the
gas orifice.

TABLE 49: GAS RATE CUBIC FEET PER HOUR

Seconds

for One

Rev.

Size of Test Dial

1/2 cu. ft.

1 cu. ft.

10

180

360

12

150

300

14

129

257

16

113

225

18

100

200

20

90

180

22

82

164

24

75

150

26

69

138

28

64

129

30

60

120

32

56

113

34

53

106

36

50

100

38

47

95

40

45

90

42

43

86

44

41

82

46

39

78

48

37

75

50

36

72

52

35

69

54

34

67

56

32

64

58

31

62

60

30

60

CFM

Btu Input

0.8

1.08

Δ°F

(

)

-----------------------------

=