4 stacking scenario examples, Figure 15 stacking example 1 – ZyXEL Communications ZyXEL Dimension ES-4024 User Manual
Page 47

ES-4024A User’s Guide
46
Chapter 3 Hardware Overview
3.4 Stacking Scenario Examples
Use Ethernet cables when stacking the switches. See the following figures for example
stacking scenarios using the stacking module. The switches must form a closed ring in all
scenarios.
Figure 15 Stacking Example 1
100/1000
Green
On
The link to a 1000 Mbps Ethernet network is up.
Amber
On
The link to a 100 Mbps Ethernet network is up.
Off
The link to an Ethernet network is down.
ACT
Green
Blinking
The port is receiving or transmitting data.
On
The port has a connection to an Ethernet network but not
receiving or transmitting data.
Off
The link to an Ethernet network is down.
LNK (mini
GBIC
Slots)
Green
On
The port has a successful connection.
Off
No Ethernet device is connected to this port.
ACT(mini
GBIC
Slots)
Green
Blinking
The port is sending or receiving data.
Off
The port is not sending or receiving data.
Table 2 Front Panel LEDs (continued)
LED
COLOR
STATUS
DESCRIPTION