The following information displays in this dialog box: Name
assigned to the scheduled event, selected Report to Run,
interval When to Run the report, Day of the Week to run the
report if the report is a daily report, and Start Time to run.

Edit a Scheduled Event

1. In the Scheduled Events box, click the grey button in the

Edit column for the event you wish to modify. This action
opens the Add Event to Schedule dialog box. In this dialog
box you can:

change the Name of the report

make different selections as necessary from the pull-

down menus for Report to Run, When to Run, and/or
Day of the Week

change the Start Time for running the report

TIP: Click Cancel if you wish to return to the Scheduled Events

box without saving your edits.

2. Click the Update button. This action opens an alert box with

the message: “Event added to schedule”.

3. Click OK to close both the alert box and the Add Event to

Schedule dialog box.

4. Click the Refresh button to display your edits in the Sched-

uled Events box.