Hama VMDD26 User Manual

Page 8

Advertising
background image

ENGLISH

Step 4: Attach the Arm Assembly to the Television (Part II)
Warning: The 1” Diameter Tubes must extend beyond the outside edges of both Monitor Brackets and the Allen

Bolts in all 4 Vise Assemblies in the Monitor Brackets and the 4 Vise Assemblies in the Arm Assembly must be

tightened for the installation to be safe!
Position the Arm Assembly (b) so that the hook shaped tab shown in the Detailed View of Diagram 4b is on the top. Line up the two 1”
diameter holes in the Monitor Bracket (e) at the other end of the Arm Assembly with the with the 1” Diameter Tubes (d). Continue to push
the 1” Diameter Tubes through both the vise assemblies on the Arm Assembly and then through the other Monitor Bracket. Again, make
sure the Vise Assemblies (f) on both the Arm Assembly and the second Monitor Bracket are oriented so that the 1” Diameter Tubes will
pass between the jaws. Once the 1” Diameter Tubes are in place, tighten the allen bolts on the four Vise Assemblies in the two Monitor
Brackets with the Allen Key (l) to lock the television to the mount. Next, slide the Arm Assembly into the desired position between the two
Monitor Brackets and tighten the four remaining Allen Bolts in the Vise Assemblies inside the Arm Assembly. See Diagram 4b below.

Detailed View

Diagram 4b

tab

Note: Sanus recommends Arm Assembly to be centered between Monitor Brackets

Step 5: Attach the Wall Plate: Wood Stud installations only.
Warning: DO NOT OVERTIGHTEN THE LAG BOLTS! Tighten Lag Bolts (i) only until the Lag Bolt Washer (j) is pulled

firmly against the Wall Plate (a).
The Wall Plate (a)

must be mounted to two wood studs at least 12” apart. Use a high quality stud sensor to locate two adjacent

studs. It is a good idea to verify where the studs are located with an awl or thin nail. Pre-drill a 2.5” deep hole in each stud at the desired
height using a 3/16” drill bit. Make sure these holes are in the center area of the studs and level with each other. Use the Wall Plate as
a template to mark the location of the second hole in each stud. Drill 2.5” deep holes using the 3/16” drill bit in the marked locations.
Attach the Wall Plate to the wall using four Lag Bolts (i) and four Lag Bolt Washers (j). Make sure the Wall Plate is oriented so the flat
surface in the center of the plate is against the wall. See Diagram 5 below.

Diagram 5

wall stud

i

j

a

drywall cutaway

to show studs

VMDD26ins_011206_ML.indd 8

1/16/06 4:39:18 PM

Advertising