MSD 2910 Atomic EFI Master Kit Installation User Manual

Page 17

Advertising
background image

INSTALLATION INSTRUCTIONS

17

M S D

•   W W W . A T O M I C E F I . C O M   •   ( 9 1 5 )   8 5 5 - 7 1 2 3   •   F A X   ( 9 1 5 )   8 5 7 - 3 3 4 4

b. Remove the snap ring that holds the magnetic

pickup assembly in place.

c. Gently lift up on the mag pickup plate and slide

the vacuum canister out.

d. Install the Lockout Plate in place of the canister.

Install the two retaining screws.

e. Install the supplied screw and washer through

the Lockout and tighten.

f. It is important to make sure the pickup plate

is parallel with the housing of the distributor

(Figure 16). If it is cocked or slanted, the

paddles of the reluctor may contact the pickup.

g. Check the clearance by rotating the distributor

shaft. If necessary, use the supplied shims

under the Lockout hold-down to correctly

position the pickup plate.

Note: If no shims were required, use one beneath

the washer of the Lock-Out Hold Down Screw.

INSTALL THE ADJUSTABLE ROTOR

1. Install the new adjustable rotor (MSD PN 84211 or

PN 8421).

2. Set the phasing of the adjustable rotor based on the information below.

ROTOR PHASING

To phase your rotor properly for the Atomic EFI to control ignition timing, set it retarded (opposite

rotation) at 15˚ on the rotor indicator. Remove and lockout the vacuum advance, if applicable, on all

distributors except Fords*.

* Distributor PN 8573 will need the vacuum canister removed and locked out.

Distributors PN 8386 and 8387 keep the vacuum canister in place.

Please see Appendix A for a complete list of our distributors, the required adjustable rotor, and other

applicable notes.

INSTALL THE DISTRIBUTOR

1. Position the engine at 15° Before Top Dead Center (BTDC).

2. Install the distributor making sure the rotor comes to rest pointing at the number one terminal of

the distributor cap.

3. Tighten the distributor clamp – but leave it so the distributor can be moved.

4. Connect the distributor’s magnetic pickup to the matching connector on the throttle body.

5. Connect the Yellow wire of the Atomic to the White input wire on the MSD Ignition Control. This is

the trigger signal for the ignition.

6. Install the cap and spark plug wires.

Idle RPM - Set this to the rpm at which you would like the Atomic to start advancing ignition timing

off idle.

Total RPM - This is the rpm at which the Atomic should have full ignition timing.

Figure 17 Checking Installation of the Lockout Plate.

DOME MUST

FACE UP

5/16” SCREW

CLOCKING

TABS

POSITION ON

BASE AND

ROTATE INTO

POSITION

Figure 18 Two Piece Rotor, PN 84211.

Advertising