3 sample preparation (cont), 4 running the test – Ohaus MB35 MOISTURE ANALYZER Manual fr User Manual

Page 17

Advertising
background image

MB35

EN-15

4.3 Sample Preparation (Cont).

Clear the pan, press the Tare button.

Correct amount

Homogenously distributed

Correct sample distribution

Distribution

Piling

Excessive amount

Incorrect sample distribution

4.4 Running the Test

05:00

SAMPLE
<.500G

0.000g
*

130°

Initial display.

05:00

CLOSE
COVER

0.000g
*

130°

Place sample on pan.
(See above for correct sample distribution)

05:00

TEST
READY
PRESS
START

1.300g
*

130°

Start process.

05:00

29.60%

*

0.915G

130°

130°C

02:45

Sample during drying process.

05:00

29.60%

*

0.915G

100°

05:00

TEST

OVER...

Test end.

Advertising