Banks Power Chevy_GMC Trucks: Duramax LB7 (Diesel ’01 - 04 6.6L) Power Systems- PowerPack & Stinger Systems w_ EconoMind (LB7 & LLY) '01-05 (PDA) Compatible w_ Optional PowerPDA User Manual

Page 12

Advertising
background image

20.

Tighten the exhaust clamp at

each of the three (3) joints. Figure

4 illustrates the proper location of

an exhaust clamp on a tubing joint.

Torque the nuts on each of the

exhaust clamps to 35 ft-lb. Note: If a

combination hanger/clamp is utilized,

evenly torque nuts to 35 ft-lb. The

clamps only need to be tight enough

to form a seal and hold the pipes

together. Over tightening the clamps

may cause the system to leak due to

the pipe being crimped. Torque the

four (4) factory flange nuts, previously

removed, to 30 ft-lbs.

21.

Install exhaust tip by sliding

it over the outlet of the tailpipe.

The tip should be positioned so

that the outlet of the exhaust tip

is approximately one (1) inch past

the outlet of the tailpipe or where

aesthetically pleasing.
NOTE: On vehicles with dual rear

wheels, the outlet of the tip should

be placed approximately 3.5 inches

past the outlet of the tailpipe.
Torque the band clamp to 35 ft-lb.

Skip to Step 34 to complete Banks

Monster Exhaust System.
BANkS SPLIT-DuAL MoNSTER

ExHAuST SySTEM (Step 22 thru

33)

22.

Install a 4”saddle clamp onto

the Monster muffler inlet. Install

the Monster muffler inlet onto the

Banks intermediate pipe outlet. Be

sure that the inlet side of the muffler

(see markings on muffler body)

is facing toward the front of the

vehicle. Orient the muffler such that

the “Banks Monster” logo is facing

towards the frame and is level with

the ground. Verify that the muffler

and intermediate pipe are completely

engaged.

23.

Install the muffler hanger clamp

onto the muffler outlet. Insert the

hanger pin into the vehicle’s rubber

grommet.

24.

Install the Banks Y-pipe into the

muffler outlet such that the outlets

are pointing up. Install a 3-

1

2

” saddle

clamp onto each y-pipe outlet (See

Figure 5).

25.

Install the driver-side hanger

bracket into the rear of the driver-

side frame rail. If a hitch is installed,

remove the hitch hardware on the

driver-side, install the frame bracket

and reinstall the existing hitch

hardware.

For Long bed models, use one (1) bolt

on the flat of frame rail and one (1)

bolt on the side of the frame rail.
For Short bed models, use two (2)

bolts on the flat of the frame rail (no

bolts on the side). See Figure 6.

26.

Install the supplied rubber

grommet onto the Banks hanger

bracket.

27.

Install the driver-side tailpipe

(longer) into the top Y-pipe outlet.

Install the driver-side tailpipe hanger

into the Banks rubber grommet.

28.

Install the passenger-side

tailpipe (shorter) into the lower

Y-pipe outlet. Install the passenger-

side tailpipe hanger into the vehicle

rubber grommet.

29.

Adjust each of the pipes to

ensure that all of the hanger pins

are parallel with the frame mounted

pins and that the rubber hangers are

all positioned slightly forward (See

Figure 3). This allows the hangers

to be properly positioned once the

exhaust system reaches operating

temperature.

30.

Be sure that the two (2) tailpipes

are completely engaged into the

Y-pipe. Rotate the tailpipe until the

hanger pins are parallel with the

frame-mounted pin. Be sure both

tailpipe tips look symmetrical.

NOTE: Minimum distance between

exhaust tip and body is a half (

1

2

)

inch.

31.

Tighten the head pipe V-band

clamp to 12 ft-lbs (if previously

loosened).

32.

Align the saddle clamps on the

radius of the corresponding pipe

slots. Figure 4 illustrates the proper

location of an exhaust clamp on a

tubing joint. Torque the nuts on each

of the exhaust clamps to 35 ft-lbs.

Torque the four (4) factory flange

nuts, previously removed, to 30 ft-

lbs. Torque the hanger bracket

1

2

hardware to 65 ft-lbs.

33.

Using the three (3) supplied wire

ties, tie any hoses, brake lines or

harnesses a minimum of four inches

away from the exhaust/tail pipes.

34.

Remove the protective covering

from the tailpipe tip.
Caution: the protective covering

may ignite and burn if not

removed prior to running the

engine.

35.

The Banks Monster Exhaust

installation is now complete.

-END, SEcTION 1-

Figure 6 Short-bed model shown

12

96776 v.11.0

Advertising