Banks Power Chevy_GMC Trucks: Duramax LB7 (Diesel ’01 - 04 6.6L) Power Systems- PowerPack & Stinger Systems w_ EconoMind (LB7 & LLY) '01-05 (PDA) Compatible w_ Optional PowerPDA User Manual

Page 33

Advertising
background image

Section 6 not needed if installing

the Power Level Selector Switch.

Please proceed to Section 7.
Note: This system has been

designed for use with the Palm

Tungsten E2 PDA.
Warning: The PDA may be

susceptible to damage as a

result of extended exposure

to sunlight, heat or extreme

cold. It is highly recommended

that the PDA be removed from

its mounting location if the

vehicle will be subjected to high

concentrations of sunlight, heat

or cold for an extended period

of time. Gale Banks Engineering

is not responsible for damage to

PDAs resulting from exposure

conditions.
Locate the Docking Station in your

kit. For mounting location see

Figure 40

.

Note: In cold climates, best

results will be obtained if the

vehicle’s heater is run to bring the

inside temperature up to “room

temperature” (at least 68°F).

1.

clean mounting area with

supplied alcohol swab to prepare the

surface for the adhesive tape.

2.

The Docking Station has adhesive

tape applied to it at the factory. Prior

to removing the protective liner from

the tape, test fit the unit on the dash

as indicated in Figure 40. The Docking

Station will fit the dash contours only

where shown in the photo.

3.

After test fitting, remove the liner

from the adhesive tape on the back

of the Docking Station.

4.

carefully align and secure the

Docking Station to the dash in the

same location as it was test fit. Press

the Docking Station firmly against the

dash for one minute to ensure good

adhesion.

5.

Locate the two self-drilling screws

supplied in your kit.

6.

Install the screws through the

two access holes in the right side

of the Docking Station. Doing this

will put two permanent holes in the

dashboard panel. Be certain of the

location of the Docking Station before

installing the screws.

7.

Two push-in plastic plugs are

provided to cover the two screw

access holes in the Docking Station.

Install the plugs at this time.

8.

Locate the Banks OBD II Interface

cable in your kit. This cable has

three connection points. connect

the RED OBD II connector on the

Banks interface cable to the vehicle

OBD II connector. Use a cable tie as

shown in Figure 41 to secure the

Banks interface cable to the vehicle

OBD II connector. Next, connect the

6-pin connector on the Banks OBD II

interface cable to the 6-pin connector

on the EconoMind Tuner harness.

9.

Finally, unclip the dashboard

panel, starting with the lower right

hand corner. (See Figures 42 thru

44) Pry and unclip as needed to

gain enough clearance to route the

RJ12 cable (simular to a telephone

connecter) behind the panel, along

its lower edge.

10.

Locate the RJ12 connector

portion on the Banks interface cable

and pull enough cable through to

reach the bottom of the Docking

Station.

Section 6

MouNTING THE DoCkING STATIoN AND CoNNECTING THE BANkS PoWERPDA

VEHICLE CoMMAND CENTER

Figure 40

Figure 41

96776 v.11.0

33

Advertising