Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Powertrain- Banks Billet Torque Converter '03-07 User Manual

Page 10

Advertising
background image

10

96799 v.2.0

8.

Loosen the bolt and disconnect the

solenoid body electrical connector.

See Figure 7.

9.

Disconnect the output shaft speed

(OSS) sensor electrical connector and

the turbine shaft and intermediate

shaft combination speed sensor

electrical connector. See Figure 8.

10.

Disconnect the left and right hand

wire harness from the sides of the

transmission.

11.

Remove the crossmember

bracket bolts on the right side of

the vehicle. Loosen the bolts on

the crossmember and remove the

crossmember from the vehicle. Retain

all hardware for reassembly. See

Figure 9.

12.

Remove the exhaust components

surrounding the transmission.

13

. Remove the starter motor.

14.

For 4x4 models, the transfer case

will need to be removed.

A) Mark and disconnect the front

driveshaft from the transfer case.
B) Remove the manual shift

linkage.
C) Disconnect the switch electrical

connector, the gear motor

encoder assembly electrical

connector, and the gear motor

electrical connector. Secure the

connector harness away from the

transmission.
D) Disconnect the vent hose from

the transfer case.
E) Position a transmission jack or

equivalent under the transfer case

and slightly lift the transfer case

to release tension on the retaining

bolts.
F) Remove the six (6) mounting

bolts connecting the transfer case

to the extension housing and retain

for reassembly. Slide the transfer

case rearward and remove the

transfer case from the vehicle.

Figure 7

Advertising