General installation practices – Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Power Systems- PowerPack & Stinger w EconoMind ('03-07) Compatible w_ Optional PowerPDA User Manual

Page 4

Advertising
background image

4

96811 v.10.0


Dear Customer, If you have

any questions concerning the

installation of your Banks Six-

Gun Diesel Tuner, please call

our Technical Service Hotline at

(888) 839-2700 between 7:00

am and 5:00 pm (PT). If you

have any questions relating

to shipping or billing, please

contact our Customer Service

Department at (888) 839-5600.
Thank you.

1.

For ease of installation of your

Banks system, familiarize yourself

with the procedure by reading the

entire manual before starting work.

This manual contains 46 pages of

copy, illustrations and parts listing.

If any pages are missing from this

manual please call Gale Banks

Engineering immediately for a

replacement.

2.

The exploded illustrations provide

only general guidance. Refer to each

step and section diagram in this

manual for proper instruction.

3.

Throughout this manual, the

left side of the vehicle refers to the

driver’s side, and the right-side to the

passenger’s side.

4.

Disconnect the ground cable from

the battery before beginning work. If

there are two batteries, disconnect

both.

5.

Route and tie wires and hoses

a minimum of 6 inches away from

exhaust heat, moving parts and sharp

edges. clearance of 8 inches or more

is recommended where possible.

6.

During installation, keep the

work area clean. If foreign debris

is transferred to any Banks system

component, clean it thoroughly before

installing.

7.

When raising the vehicle, support

it on properly weight-rated safety

stands, ramps or a commercial hoist.

Follow the manufacturer’s safety

precautions. Take care to balance the

vehicle to prevent it from slipping or

falling. When using ramps, be sure the

front wheels are centered squarely on

the topsides; put the transmission in

park; set the parking brake; and place

blocks behind the rear wheels.

Caution! Do not use floor jacks

to support the vehicle while

working under it. Do not raise

the vehicle onto concrete blocks,

masonry or any other item not

intended specifically for this use.

8.

The Palm Tunsten E2 will need to

be charged for a minimum of

1-2 hours before the Banks software

can be installed. Locate the supplied

Ac-outlet wall charger, also located

in your kit and plug the charging cord

into the Tungsten E2. Please refer

to the Banks PowerPDA Software &

Installation Kit, Owners Manual for

additional instruction.

Warning: The PDA may be

susceptible to damage as a

result of extended exposure

to sunlight, heat or extreme

cold. It is highly recommended

that the PDA be removed from

its mounting location if the

vehicle will be subjected to high

concentrations of sunlight, heat

or cold for an extended period

of time. Gale Banks Engineering

is not responsible for damage to

PDAs resulting from exposure

conditions.

General Installation Practices

Advertising