Chapter 1 top dry air box assembly, Chapter 1, Top dry air box assembly – Grain Systems PNEG-1890 User Manual

Page 5

Advertising
background image

1

Top Dry Air Box Assembly

Topics Covered in this Chapter

▪

Assemble Air Box Covers

▪

Assemble Vent to Angle Plate

▪

Attach Vent Assembly to Side Plate

▪

Attach Side Plate Assembly to Support Frame

▪

Assemble Top Spout to Support Frame

▪

Install Inner Spout

▪

Assemble Door Frame

▪

Install Sliding Access Door

NOTICE

Use a silicone based caulk along all connecting surfaces throughout the assembly to
assure a water tight fit.

Pneg-1890 Top Dry Air Box

5

Advertising