Bottom auger motor, Installation – Grain Systems PNEG-1764 User Manual

Page 10

Advertising
background image

2. Installation

10

PNEG-1764 Leeson Motor Field Installation for 5 HP Load and 7-1/2 HP Unload Applications

Bottom Auger Motor

Step 3:

(See Figure 2D.)

1. Disassemble auger cleanout handle mechanism to provide easier access to the motor.

2. Remove belts and sheave from motor shaft.

3. If the dryer is an FFI model with 7" metering rolls, replace the meter roll pan lever with D01-2605.

(See Figure 2E on Page 11.)

This will resolve any interference with the new motor.

4. Replace the present 712-1 Baldor motor with the D03-1010 Leeson motor.

5. Install new 28138-2 sheave on motor shaft.

6. Install new MHC00793 B84 belts and adjust tension.

Figure 2D

New sheave
(28138-2)

New belts
(MHC00793)

New motor
(D03-1010)

Bottom auger drive components

If this is the FFI dryer, replace meter roll pan
lever with D01-2605 before installing new motor.

Bottom auger motor
and motor mount

Advertising