Part No./Process

Critical Process/Inspection Parameters

Removal Date:

Issue Date: 7/15/2010

Approval:

Reviewed By: Jeff Falconer

It is imperative that all 510 and 1220 dryers using
7.5 HP Leeson Motor be reworked as follows:

1) All 10 gauge wire for load circuit to be
removed from motor to control panel.

2) 8 Gauge wire must be installed from motor to
control panel and wired to new contactor.