Cleanout door mechanism – Grain Systems PNEG-1764 User Manual

Page 12

Advertising
background image

2. Installation

12

PNEG-1764 Leeson Motor Field Installation for 5 HP Load and 7-1/2 HP Unload Applications

Cleanout Door Mechanism

Step 4:

(See Figure 2F below and Figure 2G on Page 13.)

1. To allow adequate clearance between the linkage arm and the motor, move the handle to the left side

of the pivot arm weldment.

2. Also, move the linkage arm to the left side of the cleanout door hinge.

(See Figure 2G on Page 13.)

3. Adjust linkage for correct operation of the cleanout door.

Figure 2F

Part No./Process

Critical Process/Inspection Parameters

Removal Date:

Issue Date: 7/15/2010

Approval:

Reviewed By: Jeff Falconer

It is imperative that all GSI and FFI cleanout door
brackets be installed on the left side of the
handle as shown.

Cleanout arm must be fastened at both ends on
the left side of the handle.

N5

Cleanout Door

Present assembly

Revise assembly after leeson motor installed

Linkage adjustment bolts

Advertising