Fenwal-series 05-14 – Grain Systems PNEG-377 User Manual

Page 94

Advertising
background image

94

Fan and Heater

FENWAL-SERIES 05-14

2.

With the gas supply shut off, apply electri-

cal power to the system by closing the

control switch or by advancing the thermo-

stat.

3.

Check to insure that sparking occurs at the

electrode tiops and across the 1/8" gap

during the "trail-for-ignition" period speci-

fied for the unit. (See Specifications.)

4.

05-142 thermostate reset models will lock-

out after the "trial-for-ignition" period and a

few seconds later will trip the circuit

breaker.

5.

Manually open the gas supply line and

either cycle the thermostat or depress the

manual reset button to recycle the unit.

6.

Check that ignition has been accomplished

within "trial-for-ignition" period. Sparking

will cease immediately after ignition.

7.

If system ignites but fails to hold-in, check

input voltage and polarity and check to

assure that L2 line is grounded. If system

ignites but drops-out and input voltage is

correct, check level of flame current (5mi-

cro Amps minimum). check burner for

proper ground.

Safety Checks

An annual imspection and test, conducted prior to the

start of the heating season by qualified gas service

personnel, is required to verify that the automatic gas

ignition system, all associated components (i.e., fand

limit switchs), and the appliance combustion cham-

ber components operate according to the

manufacturer's specifications. Components that have

been physically damaged or that otherwise to per-

form their function according to specifications must

be replaced immediately to avoid creating fire,

explosive, and/or toxic hazards that can result

inproperty damage, personal injury or even death.

Test the control as follows:

1.

Manually shut off the gas supply and

apply power to the control board. After

the "trial-for-ignition" period has elapsed,

check that there is no voltage output

between terminals B(V1) and V2, using a

suitable voltmeter or neon tester.

2.

Manually open the gas supply line and re-

activate control unit. Sparking should

occur and immediately cease when the

flame is established. While running,

manually close the gas supply. Sparking

should promptly reappear when the flame

is extinguished. The spark should remain

on for the "trial-for-ignition" period and

the lock-out. Check that there is no

voltage output betweeen terminals B(V1)

and V2 described in section 1 above.

NOTE: Recyle system before each test by cycling

the thermostate or depressing the manual reset

button.

Repair and Replacements

Warnings

1.

The Fenwal 05-14 ignition system is not

field repairable. Any alteration or modifi

cation may result in fire, explosion, toxic

hazards, proerty damage, personal injury

or death. Consult you local Fenway

Authorized Heating Wholesaler for

replacement ignition system.

2.

Use caution to avoid miswiring a replace

ment controller. It is recommended to

remove one wire at a time from the

defective unit and reconnect it tot the

corresponding terminal of the new con

trol. Misconnection can result in condi

tions hazardous to life and property.

3.

The Fenwal 05-14 Direct Spark Ignition

System is desinged for use only on new

productrs by manufacturers of gas fired

equipment. It may be used only as such,

or as a replacement for an existing

Fenwal Spark Ignition with the same catalog

number. Any substitution or applications

must be expressly approved by Fjenwal or

the manufacturer of the equipemnt.

Improper substitutions or aapplications

may result in malfunction of equipemnt

such as loss of flame sensing safety circuit

creating an explosive atmosphere.

Advertising