PNEG-1412 Two Leg Towers

15

3. Take columns and set on founda-
tion so anchor bolts go through angle
joints. The bin bracket bolt holes
should line up on the “hills” of the
corrugation. (See Figure 4.) NOTE:
Do not attach to bin, this is for
alignment only.

4. If holes do not line up on the “hills”
of the corrugation, then you need to
remove the LATERAL BRACKET
(STC00355) from the column and re-
attach it to the column using the slots
in the lateral bracket. (See Figure 4.)
Then adjust the lateral bracket up or
down in the slots to line the holes in
BIN BRACKET (STF00016) on the
“hills” of the corrugation. Then fully
tighten lateral bracket bolts.

NOTE: DO NOT use slots in BIN
BRACKET
(STF00016) for adjust-
ment. Bolts holding lateral bracket, bin
bracket, & backing plate need to stay
in the bottom half of the slot to allow
the bin to settle. These bolts should
only be finger tight or damage may
occur to the bin.

5. To make sure the next set of lateral
brackets, bin brackets, & backing
plates, line up on the “hills” of the
corrugation, measure form the top
hole of the previously installed bin
bracket to the top hole on the bin
bracket being installed. The holes
should measure 120" apart. If they do
not, then adjust the lateral bracket
being installed following step #4
above, until the holes measure 120"
apart. (See Figure 5.) Repeat this
step for all bin brackets as the col-
umns are installed.

Pre-Measuring for Alignment (cont.)

Figure 4

120'

Figure 5

Lateral Bracket
(STC00355)

3/8" Hex Nut
(S-456)

3/8" x 1" HHCS Bolt
(S-8671)

Bin Bracket
(STF00016)

Backing Plate
(STF00021)

LATERAL
BRACKET
SLOTS

“Hills” of
Corrugation

Bin Bracket
(top hole)
(STF00016)

Bin Bracket
(top hole)
(STF00016)