1. Start with one column and run a string from top to bottom, align all joints and straighten. Tighten all
hardware. Repeat process for both columns. NOTE: DO NOT tighten hardware that connects the
bin bracket & backing plate to the lateral bracket. These bolts need to be finger tight only to
allow bin to settle.

2. When assembly is complete and hardware tightened. Stand tower assembly upright and set in
place over anchor bolts. All bin brackets holes should line up on the hills of the corrugation. Field drill
through bin brackets into hills of corrugation and bolt the tower bin brackets to bin sidewall using
3/8" x 1" HHCS bolts & hex nuts. NOTE: Bolt heads go on outside of bin.