PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin

11

Figure 2E

4. Field drill two (2) holes per platform bracket as shown and use 5/16" x 3/4" bin bolts and flange nuts

at the top connection points. The bottom connection points will also be used for the platform knee
brace during platform installation.

5. Four (4) step sections will be placed following the placement of the platform. Therefore, the

first stair wall bracket is placed four (4) bolt spaces around the bin on the second ring as shown in

Figure 2C on Page 9

. Loosely attach using two (2) 5/16" x 3/4" bin bolts and flange nuts. Attach the

vertical wall bracket to the bin in at least three (3) places. Two (2) holes will need to be field drilled
for attachment. Drill the two (2) attachment points as shown in

Figure 2C on Page 9

and use the

same hardware here.

6. Each additional stair wall bracket (STR1079) will be placed 32" below the previous and four (4)

standard bolt spaces or 37-1/2" from the previous. There will be a total of four (4) steps for each
additional section. Refer to

Figure 2C on Page 9

through

Figure 2E

for vertical wall bracket

placement. Be sure and attach the vertical wall bracket to the bin in at least three (3) places.