2. Installation
PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
23
shows the assembly of the platform floor, toe plate and vertical angles. This must all be
assembled at the same time using 5/16" hardware. Note the orientation of the vertical angles.
Figure 2AA
shows the assembly of the platform handrails. These must also be attached using
5/16" hardware.
Figure 2AB