Grain Systems Bin Accessories PNEG-1615 User Manual

Page 24

Advertising
background image

2. Installation

24

PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin

5.

Figure 2AC

shows the addition of the steps. Three (3) steps will be located above the rest platform

and four (4) are located below the rest platform. The first step above the platform will need to be
securely attached to the handrail and toe plate. A field drilled 3/8" hole will need to be placed in the
handrail in line with the slot in the step. Self-tapping screws will need to be placed in the top of the
step for connection to the toe plate.

Figure 2AC

6. Next the handrail posts can be attached as shown

in Pages 19-21

of the manual. NOTE: The handrail

for the stair section above the rest platform will need to be cut to length. A hole will have to be
drilled in the handrail to attach to the handrail post. It can be attached in the same way as previous
discussed in the manual.

Advertising