Grain Systems Bin Accessories PNEG-1615 User Manual
Page 24
![background image](/manuals/277799/24/background.png)
2. Installation
24
PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
5.
shows the addition of the steps. Three (3) steps will be located above the rest platform
and four (4) are located below the rest platform. The first step above the platform will need to be
securely attached to the handrail and toe plate. A field drilled 3/8" hole will need to be placed in the
handrail in line with the slot in the step. Self-tapping screws will need to be placed in the top of the
step for connection to the toe plate.
Figure 2AC
6. Next the handrail posts can be attached as shown
of the manual. NOTE: The handrail
for the stair section above the rest platform will need to be cut to length. A hole will have to be
drilled in the handrail to attach to the handrail post. It can be attached in the same way as previous
discussed in the manual.