Installation – Grain Systems Bin Accessories PNEG-1615 User Manual
Page 21
![background image](/manuals/277799/21/background.png)
2. Installation
PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
21
Figure 2W Upper Handrail Connection
3. After installing the top handrails, the intermediate handrails can be put into place. They will use
the top hole in the middle of the handrail post with 5/16" x 1-1/4" bolts and nut.
The large tube should be placed on the upper handrail post and the small tube should be
slid into it and placed on the lower handrail post. The very top intermediate handrail connecting the
platform to the first post may need to be shortened. Equal amounts should be cut from both of
the handrails.
Figure 2X Intermediate Handrail
5/16" x 1-1/4"
Bolt and nut
Four (4) step
handrail (STR1077)
5/16" x 1-1/4" Bin
bolt and nut
Small intermediate
handrail (LDR-4088)
Large intermediate
handrail (LDR-4087)