6.2 Low headroom trolley, drum size

φ 243 mm

Clearance between the wheel flange and the main girder flange (measure X) must be 3…5 mm. Ensure
that the clearance is equal on both ends of the trolley.

c_qztr01c

5

1

4

2

3

6

1. Locking washers
2. Fixing nuts
3. Plain washers
4. Adjusting nuts
5. Lifting mounts
6. Screw rods

• Remove the temporary transport supports. Take the hoist out of the packing and move it to the

installation site. Lift the hoist using the lifting mounts (5).

!

Do not unscrew the fixing nuts on the hoisting machinery side!


• Lift the hoist onto the beam. Adjust the X measurement until there is a gap of approximately 3…5mm

between the flange of the travel wheels and the flange of the beam.

• Check the wheels of the trolley are correctly aligned.

!

Tighten the adjusting nuts (4) on both sides to the correct tightening torque. Refer to the
section “Recommended tightening torques”
.