R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 92

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

92/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

• Switch OFF the power supply to the crane.

• Remove the shaft locking parts (8).

• Remove the side plate fixing parts (11)

• Extract the rope sheaves (10), sheave covers (9) and side plates (11).

• Remove the cover plate (7)

• Remove the locking ring (or nut) (6) and thrust bearing (5).

• Extract the hook (3) from the bearing set (4).

Re-assembly:
• Lubricate the thrust bearing and the hook shaft.

• Insert the hook (3) into the bearing house (4) and re-assemble the thrust bearing (5) and the locking

ring (or nut) (6).

1

2

1

2

c_hobeas1a

• Re-assemble the side plates (11), the rope sheaves (10), sheave cover (9) and shaft (8).

• Tighten all fixing screws to the required torque.

• Switch ON the power supply to the crane.

• Raise the hook block. Carefully guide the rope with a gloved hand until the hook block hangs free

from the working platform.

• If the lower limit switch has been adjusted, re-adjust to the correct position.
• Test the operation of the hoist.

5.29.3 Return sheave assembly


Return sheave, 4-fall, 1-rope reeving, drum size

φ 303/355/406 mm

c_sh04a_000046

2. Shaft
3. Sheave support
4. Rope sheave
5. Shaft set

Advertising