R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 76

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

76/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

5.27 Sheave support and rope anchorage support

5.27.1 Service (R2 and R4 reevings)

L. Locking plate
W Locking washer
OW Old type washer
L+S Locking plate + locking screw

L. Locking plate
OL. Old type locking plate
NL. New type locking plate
W. Locking washer
L+S Locking plate + locking screw

• Check that the support shaft and the rope anchorage plate (or overload device) are correctly in their

slots.

• Check that the locking part is in the groove of the shaft in cases which there is no other block against

the shaft's axial movement.

#

Replace locking washer (OW) or locking plate (OL) with the shaped locking plate (NL) if possible.
Or replace locking washer (W) with the locking plate (L) if possible.

• Check that fixing screws are tight.

• Check that the sheave block and the rope anchorage can freely tilt with rope.
• Lubricate the load carrying surfaces in the ends of the shaft and the rope anchorage plate with a

small amount of grease.


5.28 Rope anchorage

The free end of the rope is fixed in a suspended rope anchorage. The rope clamps ensure that the rope
can not accidentally slip through the rope anchorage.

Advertising