R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 79

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

79/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

Re-assembly:
• Insert the rope into the rope anchorage

!

Make sure the rope enters the anchorage in the correct direction. See section: “Rope
Anchorage, Service”
for details

• Insert the wedge into the rope anchorage, making sure that a length of at least six times the rope

diameter protrudes from the anchorage.

• Pull the rope firmly into the rope anchorage, so that the shaft easily fits into the suspension hole.

• Place the rope anchorage into the overload device and insert the shaft with the washers.

!

It is important that the rope anchorage is correctly mounted in the overload device. See the
below table for details:

Drum

φ 243

Drum

φ 303 and φ 355

Drum

φ 406

Drum

φ 406

Drum

φ 608

Drum

φ 608

Drum

φ 608

• Assemble the rope clamps on the protruding end of the rope and insert the split-pin. Bend the split-pin

open.

#

Insert NEW cotter pin, DO NOT reuse a removed cotter pin.

Advertising