Factory Direct Hardware Hansgrohe 10458 Axor Starck User Manual
Page 14
Advertising

6
Installation – 10452181
Use the rough as a template to mark the positions of
the screw holes in the subfloor. Use an 8 mm bit to
drill the holes.
Install the anchors (included).
Fasten the rough to the subfloor with the screws
provided. Make sure that the rough is level.
Wrap the threads on the supplies with Teflon thread
tape.
Install the supplies in the rough. For proper
operation of the tub filler, the hot supply should be
installed on the left, the cold supply on the right.
Remove the flush insert plug from the cold water
side of the rough using a 17 mm wrench. Install a
hose bibb and a hose. Turn on the water and allow
the line to flush thoroughly.
Repeat the flushing procedure on the hot water side.
Advertising