5 pre-installation, Purpose, Audience – GE Industrial Solutions CPS3200U User Manual
Page 15: Precautions, Safety, Installation tools, System identification, Cps3200u installation purpose
CPS3200U Upstream System – 23” Product Manual
CPS3200U
CC848779826 r09 December 2013
15
5 Pre-Installation
CPS3200U Installation
Purpose
CPS3200U Shelf Installation guide for generic installations. Additional requirements are needed for application specific
installations. Refer to Appendix A for spacing requirements.
Audience
Field application personnel
Precautions
Read Safety section prior to installation.
Observe ESD protection while installing circuit packs
Safety
• Always consider personal safety.
• Make sure the system is properly grounded per the National Electrical Code, local building codes, and any specific
company requirements per standard practice.
• Remove all metal jewelry before beginning the installation.
Installation Tools
•A Complete Standard Insulated tool set
•Wire cutters and strippers
•Digital meter, +/- 0.02%
•Heat shrink gun
•Screw Drivers (flat-blade and Phillips)
•Torque wrench (0-240 in-lb / 28 Nm)
•ESD wrist strap
•Sockets
System Identification
Identify the product you have received. Make sure to select procedural steps to match the product you have.