Ground the Shelf

The next step is to ground the shelf to earth ground. This is an important safety step since each converter relies on this

connection for proper ground fault detection.

Step

Action

1.

Run and connect the framework ground lead as shown.

Figure 7 Grounding Converter Shelf

2.

Use 6GA conductor minimum and connect to the safety grounding point

(frame ground, or main ground bar) per local practice. Additionally apply

NO-OX ID to all bare metal connections if required by local practice. Lugs

are ¼ inch studs on 5/8 inch centers.


Lugs for 6AWG conductor are as follows or available equivalent:
T&B 6STR30W
Burndy YAV6C-L2TC14-FX

3.

Torque connections to 4 Nm or 35 in-lbs.

Attach the Load Wiring

Provide a circuit from each converter into the designated network telephone pairs. Follow the steps in the table below

to attach load wiring to the CPS3200U shelf.

Step

Action

1.

The wiring assignment information in the following table provides the appropriate

connections for each circuit. A cable should be provided with this pinout configuration to

terminate the J1 and J2 output connectors on the CPS3200U Shelf.

Wireset Connector: RJ-21 type 50 pin plug:

• 22 AWG solid or stranded AMP 552173-1 or equivalent.
• 24 AWG solid or stranded or 26 AWG solid AMP 229974-1 or equivalent.
• The connector shall be arranged with a right angle housing such that the cable exits to the pin 1 side.