3 commissioning, 1 scope of delivery, Commissioning – YSI CR2200 Thermoreactor User Manual
Page 11: Scope of delivery, 3commissioning
Advertising
CR 2200
Commissioning
11
ba76119e01
08/2012
3
Commissioning
3.1
Scope of delivery
Thermoreactor CR 2200
Connection cable for mains connection
Operating manual
Warning
Always keep the original packing including the inner packing. If
you have to transport the instrument, the packing protects the in-
strument optimally from hard shocks.
The original packing is also required for the appropriate return
transport of the instrument if it has to be repaired.
Please note that the warranty does not cover damage caused by
inappropriate transport.
Advertising