YSI CR2200 Thermoreactor User Manual

Page 13

Advertising
background image

CR 2200

Commissioning

13

ba76119e01

08/2012

Connecting the mains

cable

The thermoreactor is ready for operation.

1

Socket for mains plug

2

Fuse holder

8

Connect the mains cable to the socket 1 on the thermoreactor.

9

Connect the mains cable to an easily available mains socket.
The thermoreactor is now in the Standby mode.
The display shows the name of the instrument.

1

2

Advertising