Assemble the packed stuffing box (e-1510-pf), Reinstall the bearing frame and impeller assembly – Xylem P2001406B Series e-1510 Centrifugal Pumps User Manual

Page 35

Advertising
background image

Assemble the packed stuffing box (e-1510-PF)

1

2

3

5

4

6

7

8

11

12

13

14

16

20

19

9

10

15

17

18

1.

Impeller

2.

Volute

3.

Volute Gasket

4.

Coverplate

5.

Coverplate Capscrews

6.

Flushing Tube

7.

Lantern Ring

8.

Packing

9.

Packing Gland

10. Bearing Frame

11. Shaft

12. Slinger

13. Shaft Sleeve

14. Bracket

15. Impeller Key

16. Impeller Washer

17. Volute Capscrews

18. Impeller Lock Washer

19. Drain Plug

20. Impeller Capscrew

1. Insert two packing rings into the stuffing box.
2. Insert the lantern ring and the last two pieces of packing.

Make sure that the joints on the packing rings are staggered 90º.

3. Install, but do not tighten, the packing gland.
4. Install the coverplate over the pump shaft.
5. Tighten the capscrews according to the Capscrew torque table in the Maintenance

chapter.

6. Tighten the packing gland to compress the packing.

See the note on the packed pump operation in the Operations chapter for more
information.

Reinstall the bearing frame and impeller assembly

1. Install a new volute gasket.
2. Install the bearing frame assembly into the volute.
3. Tighten the volute capscrews according to the Capscrew torque values table.

Maintenance

Series e-1510 Installation, Operation, and Maintenance Manual

33

Advertising