Commissioning and decommissioning

6.1.1 Checking the rotation direction

The intended direction of rotation of the drive

shaft is shown by the rotary direction arrow
(Fig. 2, 3/O).

a) Start the motor briefl y (max. two seconds) to

check the direction of rotation. When looking at
the motor fan, it must rotate clockwise.

NOTICE

Incorrect direction of rotation
Operating in the wrong direction of rotation leads
to damage to the machine.
Use a phase sequence indicator to check the direc-
tion of rotation (anti-clockwise rotating fi eld).

6.2 Decommissioning/

storing

Stop the machine

a) Switch the machine off.

b) If available close the cut off device in the suction

and pressure pipe.

c) Disconnect the machine from the electricity

source.

d) Depressurise the machine:

Open the pipes slowly.

The pressure reduces slowly.

e) Remove the pipes and hoses.

f) Seal the connections for suction and discharge

nozzles with adhesive foil.

see also Section 3.2.1, Page 11

6.3 Re-commissioning

a) Check the condition of the machine (cleanliness,

cabling etc.).

For installation see Section 5 Page 16

For commissioning see Section 6.1 Page 20