4.2 Using the Standard Interface Device

22

4. OPERATION

Figure 10

Test LED and Output Load LED Indicators

UPS Powering Up

Whenever the CFR is powering up, the TEST LED flashes for a few

seconds. At the same time the OUTPUT LOAD indicator LEDs flash in a
chasing pattern to indicate that there is no output. As soon as the power up
sequence is completed, the TEST LED switches OFF and the OUTPUT
LOAD display LEDs show the percentage of the load.

Output Shutdown Pending

The TEST LED will flash to indicate that a UPS output shutdown is

pending to occur. When the operator gives an output shutdown command
(either via the RS-232 serial port or by the LAN Interface port), the UPS
delays the shutdown (for a programmable period) before actually switching
off the output.

Output Shutdown In Progress

The five OUTPUT LOAD LEDs will flash in a chasing pattern whenever

the CFR output is switched off by an output shutdown command (either via
the RS-232 serial port or by the LAN Interface port). This will also occur
when the unit is first powering up.