4 Operation

4.1 Testing Bypass Switch Operation

CAUTION: This test must first be performed with all power to the Bypass Switch turned

OFF..

To test that all connections are made correctly, with all power to the bypass switch turned off,

measure the resistance between pin 2 & 3, 5 & 7, and between 9 & 11 to ensure that there is

no connection between the two sources of power (UPS and BYPASS). Then turn the switch to

the BYPASS position and turn the UPS and the bypass circuit breaker ON so that power from

both sources is available at the bypass switch.
Verify the following voltages shown in Table 3 below.

CAUTION: DO NOT OPERATE THE SWITCH IF THE MEASURED VOLTAGES ARE

GREATER THAN SHOWN IN TABLE 3 ABOVE.

If you cannot obtain the indicated voltages, check your wire connections. For example, is L1

of the UPS input connected to the same phase as L1 of the bypass line? Also check the input

and output voltages of the UPS and / or the Bypass Transformer as shown in Table 4. Contact

ALPHA if the phasing is not correct or if you need further assistance.

Table 3 - BPS Voltages Phase Checks

Ground to Neutral

(GND to pin 5/7 of BPS )

< 5 V

Ground to L1

(GND to pin 1/3 of BPS )

110 - 125 V

Ground to L2

(GND to pin 9/11 of BPS ) 110 - 130 V if 240 V system

75 - 95 V if 208 V system

L1, UPS - BYPASS

(pin 2 to pin 4 of BPS)

< 20 V

< 100 V

N, UPS - BYPASS

(pin 6 to pin 8 of BPS)

< 20 V

< 20 V

L2, UPS - BYPASS

(pin 10 to pin 12 of BPS)

< 20 V

< 100 V

Voltage Check:

Measuring Points

Measured Voltages

Make-Before-

Break Bypass

Switch

Break-Before-

Make Bypass

Switch

Measuring Points

Phase Check:

Table 4 - UPS / BPT Voltage and Phase Checks

(All measurements are at no load)

CFR with 120 Volt input

input L1 to output L1

< 30 V

> 180 V

input L2 to output L1

> 180 V

< 30 V

CFR with 208 or 240 V input

input L1 to output L1

< 100 V

> 180 V

input L2 to output L1

> 180 V

< 100 V

Bypass Transformer

H1 to X1

< 100 V

> 200 V

H1 to X5

> 200 V

< 100 V

UPS or BPT

Measuring Points

Correct Phas-

ing

Out of Phase

Operation

Doc# 020-133-B0 Rev. 01 / 07