Replacing the Internal Batteries (Continued)

Step 2: Charger Voltage Test

This tests the unit’s charger so the new batteries will not damaged by a faulty charger. Do
this before removing the batteries.

Procedure:

1

Make sure:

• The Battery circuit breaker is switched off.

• The Input circuit breaker is switched on.

• The utility line is connected.

2

Measure the DC voltage by:

• Connecting the positive (+) to the top connector of the battery circuit breaker.

• Connecting the negative (–) to the chassis (Figure 5.2).

3

The voltage should be between 54 VDC to 57 VDC.

• If it is, switch off the Input circuit breaker, disconnect the utility line and go to Step 3.

• If it is not, the charger is faulty. Contact Alpha Technologies customer service de-

partment.

Charger Voltage Test Finished

Figure 5.2

Charger Voltage Test

W T 10 2

TO

O

U

TP

U

T

R

EC

EP

W T 10 3

2

1

D

2

1

Positive (+) to top connector of

BATTERY CIRCUIT BREAKER.

Negative (-) to unit chassis.

Voltage to be between

54 VDC to 57 VDC.