2 mounting roe- ii, 1 setting up, Setting up – DE DIETRICH ROE-II _ ROE-H User Manual

Page 13

Advertising
background image

13

13/01/2011 - 300019360-001-I

ROE-II / ROE-H

4.2 Mounting ROE- II

4.2.1

Setting up



No obstacles should hinder the free circulation of air on
the air exchanger (intake

and output).

„

Installation in a garden



: Concrete base frame

: Condensates run-off

: Install a run-off channel with pebble bed

„

Installation on a terrace



: Concrete base frame



Smooth concrete slab, levelled, suporting the load.

A

Advertising