Checking and maintenance, General instructions, Periodic checks – DE DIETRICH TWINEO EGC 25 User Manual

Page 21: 5 checking and maintenance, 1 general instructions, 2 periodic checks

Advertising
background image

5 Checking and maintenance

5.1

General instructions

The boiler does not require a lot of maintenance. Nevertheless, we

recommend having the boiler inspected and serviced at regular

intervals.

4

Maintenance and cleaning of the boiler must be carried out at least

once a year by a qualified technician.

4

Have the flues swept at least once a year or more, depending on

the regulations in force in your country.

CAUTION

4

Maintenance operations must be done by a qualified

engineer.

4

We recommend taking out a maintenance contract.

4

Only original spare parts must be used.

4

Make certain that the flues and chimneys are

connected, in good condition and not blocked.

4

Do not modify nor block the condensate outlet(s).

4

If a neutralisation system is installed, follow the

instructions delivered with the neutralisation system

for cleaning and servicing of this system.

5.2

Periodic checks

4

Check the water pressure in the installation (Menu
INFORMATION

).

If the water pressure is lower than 0,8 bar, more water

should be added. If necessary, top up the water level in the

heating system (recommended hydraulic pressure

between 1,5 and 2,0 bar).

4

Carry out a visual check for the presence of any water leaks.

T001507-B

EGC 25

5. Checking and maintenance

03/12/2013 - 300026082-001-02

20

Advertising