Hydrotech Precision-PWS 45-75 OWNERS GUIDE User Manual

Page 5

Advertising
background image

1. Attach the steam tower to the top of the distiller using the centering ring and clamp provided. Attach as shown on diagram and

tighten only until snug. Over tightening can cause the centering ring, O ring to be forced from its seal and cause the steam tower

to leak. See Figure #3

Figure 3

2. To start your distiller follow the below instructions:

A) Make sure the water saddle valve is turned on and the distiller is plugged into its recommended power source.

B) Turn main power breaker switch on. This is the main power source for the distiller, when this switch is off it will turn

power off to the complete unit. It also serves as a main breaker for the distiller.

C) Turn the power switch on.

D) Turn the fan switch on.

E) Turn the water switch on. This will start opening up the solenoid valve and let the water into the boiler. As the distiller

fills the boiling tank and reaches the proper water level then the fan and heater will start to produce the water.

F) If you have our pump option, turn the water pump switch on. This will activate the plug at the rear of the distiller once

the storage tank fills with approximately 2” of water.

04/08/04

Page 5

'097045

Figure 4

Advertising